BBV Compliance Dashboard

Monitor your province's BBV budget health in real-time.

The BBV Compliance Dashboard surfaces the four spending KPIs (total budget, committed, spent, remaining), the budget-vs-actuals bar chart, the cumulative spend trend, and an exceptions block highlighting overspent programmes — all keyed to the seven canonical BBV programme structures used by Dutch provinces (ruimte, mobiliteit, water, milieu, cultuur, economie, bestuur).

Goal​

By the end of this guide you will be able to read the four KPI cards, interpret the traffic-light status, drive the filters to scope the dashboard to a single programme or fiscal year, and act on the exceptions block when a programme runs over budget.

Prerequisites​

  • A Nextcloud account with Shillinq installed and enabled.
  • The active administration's administrationType is provincie — the dashboard navigation entry is hidden for non-provincie administrations (manifest visibilityPredicate).
  • At least one Budget record with a programmaStructure and one or more posted or committed GLLine records. The bbv-provincies-budgets-2026.json seed (task 21) provides a sample set; replace with real budgets in production.

Open the dashboard​

  1. Open Shillinq → BBV Provincie → BBV Compliance Dashboard.
  2. The route is /bbv-provincie/compliance-dashboard.
  3. If the navigation entry is not visible, confirm the active administration's administrationType is provincie (administrative settings).

Section 1 — Dashboard components​

The dashboard mounts three regions, in this order.

KPI cards​

Four cards at the top of the dashboard:

  • Total budget — sum of totalAmount across Budget records matching the active fiscal year filter.
  • Committed — programmeBudgetVsActuals credit-side aggregation on GLLine (orders placed but not yet paid).
  • Spent — programmeBudgetVsActuals spend aggregation on GLLine (posted spend).
  • Remaining — totalAmount − committed − spent, with a traffic-light badge applied (see Section 2).

All amounts render as EUR with the EU thousands / decimal separators.

Charts​

  • Budget vs. actuals — a horizontal bar chart, one bar per programme, with budget and spent as the two series. The chart re-queries when a filter is applied.
  • Trend — a cumulative monthly spend line. Months with zero postings render as zero rather than being omitted, so the line remains visually continuous across the fiscal year.

Exceptions block​

A list of every programme whose remaining is negative, sorted ascending (most overspent first). Each row links to the Budget-to-Programme Linker for remediation. When no programme is over budget the block shows the empty state No overspends.

Section 2 — Interpreting the traffic-light status​

Each programme card and the Remaining KPI carry a traffic-light badge driven by the declared thresholds in src/manifest.d/bookkeeping-provincies-bbv-variant.json:

StatusRuleOperator action
Greenremaining / totalAmount ≥ 0.15 (more than 15% of the budget left)None — programme is healthy.
Yellow0 ≤ remaining / totalAmount < 0.15 (less than 15% headroom)Review committed orders; consider scaling new spend.
Redremaining < 0 (overspent)Address via the Budget-to-Programme Linker — re-map a misallocated GL line, or amend the budget. The exceptions block surfaces the programme automatically.

The thresholds are declarative — never hard-coded in Vue — so a future policy change (e.g. yellow at 10% instead of 15%) is a manifest edit plus an app version bump, not a code release.

Section 3 — Using filters​

The dashboard exposes three filter facets, declared in the manifest:

  • Programme — multi-select across the seven BBV programme structures. An empty selection means "all programmes".
  • Fiscal year — single-select; defaults to @currentFiscalYear. The list is sourced from the distinct fiscalYear values on Budget.
  • Budget status — multi-select across approved, provisional, amended. Defaults to all-active (provisional + approved); amended is opt-in.

Filters cumulate (AND logic) — selecting mobiliteit plus fiscal year 2026 plus status approved reduces the dashboard to one programme, one year, one budget posture. The bar chart, trend chart, and exceptions block all re-query when a filter changes.

Section 4 — Troubleshooting​

Dashboard appears empty / KPI cards all read €0​

  • Confirm the active administration is a provincie. The visibilityPredicate hides the dashboard for non-provincie administrations.
  • Confirm at least one Budget record exists with a fiscalYear matching the dashboard filter. The default filter is the current fiscal year — old budgets are excluded unless you change the filter.
  • Confirm the GL lines you expect to see have a programmaStructure value. GL lines with a null programme are excluded from the programme aggregations. Use the Budget-to-Programme Linker to assign them.

Data looks stale​

  • Default refresh cadence is daily (nightly batch at 02:00 UTC).
  • Switch the cadence via Admin settings → Dashboard refresh interval (task 11). Options: real-time (deferred to T4), hourly, daily, weekly.
  • Use the manual refresh button on the dashboard if the cadence is longer than your audit window.

A programme is missing from the bar chart​

  • Check the Programme filter — an active multi-select might have excluded it.
  • Confirm a Budget record exists for that programme in the active fiscal year. The chart renders one bar per Budget row, not one bar per programme; an unbudgeted programme draws no bar.

What you have now​

A read-only view of your province's BBV budget health, scoped to the active fiscal year and filters, with traffic-light alerts on overspent programmes. To re-map GL lines to the correct programme, use the Budget-to-Programme Linker.