Endpoint: GET /index.php/apps/shillinq/api/revenue/cutoff Spec: bookkeeping-ifrs15-revenue — REQ-IFRS15-007, REQ-IFRS15-008. Service: lib/Service/RevenueCutoffService.php (+ pure-logic lib/Service/RevenueRecognitionCalculator.php). Controller: lib/Controller/RevenueController.php#cutoff.

Purpose

Read-only IFRS 15.116-119 contract-balance + IFRS 15.120 RPO computation for a single administration at a given period end. Used by:

  • the Revenue Waterfall dashboard,
  • the Contract Balances dashboard,
  • the nightly cut-off scheduled-job wrapper that writes the GL reverse-then-post entries on RevenueRecognitionEvent,
  • downstream CFO dashboards.

The endpoint is read-only: it does NOT post GL transactions. The GL materialisation is the responsibility of the scheduled job wrapping the service (REQ-IFRS15-007) — that wrapper consumes this endpoint's output, honours the bookkeeping-period-close REQ-PC-004 open-period check, and posts the compensating GL lines.

Authentication

#[NoAdminRequired] controller — any authenticated Nextcloud user may call. The service is administration-scoped per ADR-005: the administration_id query parameter MUST refer to an administration the caller has access to. The controller resolves the caller from IUserSession and authorises the administration access before dispatching to the service.

Request

GET /index.php/apps/shillinq/api/revenue/cutoff?administration_id=adm-1&period_end=2026-06-30
Query parameterRequiredDescription
administration_idyesAdministration to scope the cut-off to (ADR-005 IDOR-safety).
period_endyesISO date the cut-off covers (YYYY-MM-DD). Events after this date are excluded.

Response

200 OK:

{
"data": [
{
"contractId": "C-2026-001",
"periodEnd": "2026-06-30",
"transactionPriceAllocated": 360000.0,
"cumulativeRecognised": 89143.0,
"periodRecognised": 7143.0,
"cumulativeBilled": 90000.0,
"remainingAmount": 270857.0,
"contractAsset": 0.0,
"contractLiability": 857.0,
"administrationId": "adm-1"
}
],
"total": 1
}

The numbers above match the Example 1 scenario in openspec/changes/bookkeeping-ifrs15-revenue/design.md and the integration test Ifrs15RevenueIntegrationTest::testContractGroupCombination cell totals.

400 Bad Requestadministration_id or period_end missing or malformed. 500 Internal Server Error — an unexpected fetch failure; the controller returns no stack trace (operator-safe).

Contract lifecycle state machine

The Contract register declares an x-openregister-lifecycle with these states and transitions:

draft --sign--> signed
signed --beginDelivery--> in-delivery
in-delivery --complete--> completed
in-delivery --cancel--> cancelled
any --cancel--> cancelled (with operator confirmation)

Each transition fires the materialisation on RevenueRecognitionEvent declared in lib/Settings/register.d/bookkeeping-ifrs15-revenue.json so the GL captures the recognition timing.

PO satisfaction events

For an over-time PO the cumulative recognised revenue is:

cumulativeRecognised = SUM(recognisedAmount) WHERE periodEnd <= period_end
AND contractId = ?
AND administrationId = ?

Each RevenueRecognitionEvent carries an evidenceReference pointing at a timesheet, milestone, delivery note, or sign-off so the auditor can trace the recognition to a supporting document (REQ-IFRS15-005, REQ-IFRS15-007).

Variable-consideration re-estimation

A re-estimation creates a VariableConsiderationAdjustment row carrying the prior estimate, new estimate, delta, constraint reason, and operator. The delta is applied via a compensating GL transaction (debit accrued-revenue / credit revenue on an estimate increase; reverse on a decrease). The constraint is applied per IFRS 15.56 — the amount entering the transaction price is limited to the amount highly probable not to reverse. See RevenueRecognitionCalculator::constrainedVariable() for the deterministic arithmetic.

GL posting patterns

The implementing cycle wires the GL writes as follows:

  • Recognition event (debit accrued-revenue / credit revenue) — fires on RevenueRecognitionEvent create via the schema-level materialisation.
  • Nightly cut-off (debit/credit deferred-revenue or accrued-revenue control accounts) — runs idempotently, REVERSE then POST.
  • Variable-consideration re-estimation — compensating GL transaction with the delta amount.
  • Contract-cost impairment — write-down GL transaction reducing the carried ContractCostAsset amount.

All postings respect the T1 BalanceGuard invariant (debits = credits).